Trådlös Accesspunkt/CPE Utomhus 5GHz 900Mbps IP55 802.11ac 14dBi Antenn Trådlös Accesspunkt/CPE Utomhus 5GHz 900Mbps IP55 802.11ac 14dBi Antenn Trådlös Accesspunkt/CPE Utomhus 5GHz 900Mbps IP55 802.11ac 14dBi Antenn Trådlös Accesspunkt/CPE Utomhus 5GHz 900Mbps IP55 802.11ac 14dBi Antenn

Trådlös Accesspunkt/CPE Utomhus 5GHz

900Mbps IP55 802.11ac 14dBi Antenn

Artikelnummer: WBS-512AC
BeskrivningDokumentationTillbehörAlternativAndra köpte också
Beskrivning

Flexible and Reliable Outdoor Wireless Solution with Superior Performance

PLANET WBS-512AC 802.11ac WAVE 2 900Mbps Outdoor Wireless CPE offers a better range and excellent throughput than those of the traditional wireless device. With the standard IEEE 802.3at Power over Ethernet (PoE) design, the WBS-512AC can be easily installed in the areas where power outlets are not available. The WBS-512AC is definitely suitable for wireless IP surveillance, and bridge link of building to building and backbone of public service. Additionally, the self-healing capability keeps connection alive all the time. With the IP55-rated outdoor enclosure, the WBS-512AC can perform normally under rigorous weather conditions, meaning it can be installed in any harsh, outdoor environments.

Industrial Compliant Wireless LAN and LAN

Compliant with the IEEE 802.11a/n/ac WAVE2 MU-MIMO wireless technology
2T2R architecture with data rate of up to 900Mbps
Equipped with two 10/100/1000Mbps RJ45 ports with auto MDI/MDI-X supported
 

Fixed Network Broadband Router

Supported WAN connection types: DHCP, Static IP, PPPoE
Supports Port Forwarding and DMZ for various networking applications
Supports DHCP server in Gateway/WISP mode
 
RF Interface Characteristics

Built-in 14dBi dual-polarization antenna
High output power with multiply-adjustable transmit power control
 

Outdoor Environmental Characteristics

IP55 rating
IEEE 802.3 at Power over Ethernet design
Operating temperature: -20~70 degrees C
 

Multiple Operation Modes and Wireless Features

Multiple operation modes: AP, Gateway, Repeater, Super WDS, WISP
WMM (Wi-Fi multimedia) provides higher priority to multimedia transmitting over wireless
Coverage threshold to limit the weak signal of clients occupying session
Real-time Wi-Fi channel analysis chart and client limit control for better performance
Support Terminal Fast Roaming with 802.11k, 802.11v, and 802.11r
 

Secure Network Connection

Full encryption supported: WPA/WPA2, WPA-PSK/WPA2-PSK and 802.1X RADIUS authentication
Supports 802.1Q VLAN and SSID-to-VLAN mapping
Supports IP/Port/MAC address/URL filtering, DoS, SPI Firewall
Supports DMZ and Port Forwarding
Bandwidth control per IP address to increase network stability
 

Easy Installation and Management

3 simple steps to establish PtP ( AP + Repeater ) connection easily
Supports PLANET NMS Controllers in AP mode
Easy discovery by PLANET Smart Discovery
Self-healing mechanism through system auto reboot setting
System status monitoring through remote Syslog Server
Supports PLANET DDNS/Easy DDNS

Dokumentation
Tillbehör
Alternativ
Andra köpte också